|
* You can do
it in Tilt up
* Tall Tilt up panels 26.5 metres
* Component and Erection Engineering by Medow Burke

This commercial building was
constructed in Florence, Arizona
510 panels 500 stacked 4 high.
Largest panel weighed 108 t
Braces 15.85 m long
Cost comparison by the general contractor D. L. Withers and
the tilt up contractor Riggs Contracting Inc. established
that by using TILT UP, time and costs benefits were
achieved over pour in place concrete construction.

Photos courtesy of
Concrete Construction (The World of Concrete) magazine.
A Hanley-Wood Publication - June 2003 Issue.
|